FK location


FK Automotive GmbH, the Backnang location





Address 1: Exhibition / Reception: FK Automotive GmbH
End customer collection of goods at Erlenwäldchen 14/2
71691 Freiberg am Neckar

Opening times for collections Monday - Friday: 9 a.m. - 12 p.m. and 1 p.m. - 5 p.m.



Address 2: Logistics Center FK Automotive GmbH
Only forwarding agents Erlenwäldchen 14/1
71691 Freiberg am Neckar

Opening times for forwarding agents Monday - Friday: 8 a.m. - 12 p.m. and 1 p.m. - 5 p.m.



Stuttgart is also called the cradle of automotive history, Mercedes Benz and Porsche as well as many automotive suppliers are also located there. Since FK Automotive was founded, it has always been connected to the Backnang location. FK Automotive owes a lot to the city of Backnang. So FK Automotive always had an open ear when it came to expansion and contributed a lot to expanding the location. Backnang itself is a very quiet but beautiful city. It is not for nothing that FK Automotive likes to talk about the Backnang location.


You reach Backnang ...
- With a drive from Frankfurt am Main airport in about 2 hours by car
- With a driving time from Stuttgart Airport in approx. 45 minutes by car
- In 2012 the B14 is to be expanded to Backnang, so that the journey time from Stuttgart to Backnang can then be reduced to 20 minutes. From the motorway exit “Mundelsheim" you need about 20 minutes to Backnang.


The history of the Backnang location:
- Construction project 1 in 1999
Office wing (1) and warehouse 1 marked with the number (2) in the plan.
approx. 500sqm CNC production area
approx. 520 square meters of office space
approx. 750sqm high rack system for approx. 800 pallet spaces
Total area approx. 1,770 square meters

- Construction project 2 in 2002
High rack system (with number (3) for approx. 2500 pallet spaces
Total area approx. 1,350 square meters

- Construction project 3 in 2008
High rack system (with number (3) for approx. 2500 pallet spaces
approx. 9000 sqm high rack system for approx. 14,000 pallet spaces
approx. 1100qm production area (coilover suspension production)
approx. 400 square meters of office space
Total area about 10,500 square meters

The construction project was equipped with the most modern fire protection such as an ESFR sprinkler system with its own underground water supply of almost 1 million liters and the latest fire alarm technology. The latest security technology has also been integrated.


- Construction project 3 in 2008
FK supports alternative energies
In Backnang, one of the largest photovoltaic systems in the Stuttgart area was put into operation with an output of 400KWp combined with its own transformer system.

- Construction project 4 in 2009
aniba warehouse exhibition (50 polyrattan furniture sets are on display in the warehouse)
Total area approx. 650 square meters

Overall, FK Automotive has the most modern areas with a total size of 14,270 square meters of usable space on a 50,000 square meter property in Bester Lager.
FK Automotive and further expansion opportunities at the Backnang location. In this way, warehouse 3 can be expanded accordingly with an extension (green area on the right). With the expansion, the logistics area could be expanded by another 4,000 square meters.
A multifunctional building in the shape of a triangle measuring 50x50m with 4 floors can also be built behind the logistics hall (at the aniba warehouse exhibition)
There is also another construction window for another logistics center to the right of the property. A logistics center with 6000 square meters of usable space can also be built here.
The property of FK Automotive GmbH has a total area of over 50,000 square meters.